It began as a plan to replace a faded composite surface and rebuild the pergola. Once the old boards came off, the structure underneath changed everything.

Here is how the project changed, one decision at a time.

Finished Trex deck with Charcoal Black railings and a rebuilt pergola in St. Matthews, Kentucky
What began as a resurfacing became a complete deck and pergola rebuild.

The plan was simple

Giving a Familiar Deck a New Surface

When this project began in early July 2026, the homeowner was not looking for a different backyard. He wanted to preserve the deck he had used for years and renew what time had changed.

The composite surface was roughly thirty years old. It had lost much of its original color, but from above, it still looked like a reasonable candidate for resurfacing. The plan included Trex decking, a picture frame border, a center divider board, new railings at the landing and a rebuilt pergola.

The homeowner also wanted to preserve the existing pergola post covers so they could be refinished and used again.

Faded composite deck before the planned resurfacing in St. Matthews
From above, the faded composite still made resurfacing look possible.
Original wood pergola above the aging composite deck before reconstruction
The pergola and landing railings were also part of the original plan.

Then the first boards came off

What the Old Composite Had Been Hiding

A deck can look tired on the surface and still have a frame worth keeping. It can also look serviceable while years of movement and moisture have changed what lies underneath.

As we removed the old boards, the second possibility became clear. Several areas of framing had deteriorated, and the joists no longer formed a consistently flat surface. Some sat higher. Others sat lower.

New composite could cover those differences. It could not correct them.

Old composite decking being removed to expose the wood framing below
Removing the old surface gave us the first honest look underneath.
Uneven and deteriorated deck joists exposed after the composite boards were removed
The joists no longer formed the flat surface the new Trex required.

The stairs confirmed the problem

This Was No Longer Just a Resurfacing

The existing steps had also become uncomfortable for the homeowner to use. Once the stair decking came off, we found that the stringers underneath were too deteriorated to build over.

At that point, the problem was no longer limited to one section. The surface, stairs, posts and framing all had to be considered together.

Before covering anything, we stopped.

Original deck stairs before the treads and stringers were replaced
The old stair layout had also become uncomfortable for the homeowner.

New decking can hide old framing. It cannot make it level.

One honest conversation changed the project

Rebuild It, and Do It Right

Javier stayed involved in the decision, showing the homeowner the exposed framing and explaining both paths before more work moved forward.

We could place new decking over the existing frame and accept the uneven result, or remove it and rebuild the deck correctly from the ground up.

The homeowner chose the second path. He did not want beautiful new material hiding a structure he no longer trusted.

Exposed deck framing showing the structure beneath the removed composite surface
At this stage, the decision was no longer about color. It was about what the new surface would rest on.

Thirty years came down

Clearing the Way for a True Rebuild

We dismantled the remaining frame, removed the old 4x4 posts and worked the embedded concrete out of the ground. Some posts released quickly. Others had considerably more concrete around them.

By the end of demolition, the familiar deck was gone.

What remained was the same backyard, the same intended footprint and a clean opportunity to build the structure the finished design deserved.

Old deck framing being dismantled during the complete rebuild
The project had moved beyond resurfacing. The old structure had to come down.
Old 4x4 deck support post and surrounding concrete being removed
Each old post and its concrete were removed before the new layout began.

The homeowner kept the footprint. We replaced what the footprint depended on.

The rebuild began where no one would see it

New Footings, New Posts and a Better Starting Point

Keeping the deck about the same size did not mean copying its old geometry. The previous frame was not square, so the new structure was measured and laid out from the beginning.

New footing holes were excavated approximately 38 to 40 inches deep. After the concrete was ready, we installed Simpson post bases and new ground contact pressure treated 6x6 posts.

The elevated bases separate the bottom of the wood posts from direct contact with the concrete and create a connection that can be serviced more easily if a post ever needs attention in the future.

Fresh concrete footings prepared for the new deck support system
New footings created a clean starting point for the support structure.

The shape returned

Building a Self Supporting Deck From the Ground Up

The landing was one of the first familiar parts of the deck to return. From there, we framed the main structure around a double beam support system.

The new deck was designed to support itself instead of depending on a structural deck ledger fastened to the home. This avoided an unnecessary structural connection to the house and gave the deck its own support system.

Slowly, the empty yard began to look like the homeowner’s deck again. This time, the lines were square and the structure was new.

Pressure treated framing for the new landing beside the back door
The landing was the first familiar part of the deck to return.
Perimeter framing and double beam for the new self supporting deck
The new frame was built square around its own support system.

The details that disappear later

Preparing the Frame for Every Finished Line

Joists, hangers and blocking completed the main structure, but the finished pattern had to be planned before the first Trex board could be installed.

Extra framing was positioned exactly where the picture frame border and center divider board would need support. We also applied joist tape over the top edges of the framing to help protect the wood around the decking connections and fastener points.

Once the decking is installed, this work disappears. That is precisely why it matters.

Black joist tape applied over pressure treated framing before decking installation
Joist tape protects the top edges and fastener points before they disappear.
Deck blocking and extra framing prepared for a picture frame border and center divider board
The finished pattern had to be supported before the first visible board went down.

A better way down

Rebuilding the Stairs on Solid Ground

The new stairs were not treated as an afterthought. New stringers were laid out to create a more comfortable transition between the deck and the yard.

At the bottom, we prepared a dedicated concrete landing so the finished stairs would not end directly in the soil.

The work was sequenced carefully to keep wet concrete, mud and unnecessary traffic away from the new composite surface as much as possible.

New pressure treated stair stringers installed for the rebuilt deck
New stringers created a more comfortable route from the deck to the yard.
Form and ground preparation for the concrete landing beneath the deck stairs
A dedicated concrete landing kept the finished stairs from ending in soil.

The transformation finally became visible

Installing Trex Enhance in Toasted Sand

The frame had required weeks of decisions. The new surface made those decisions visible one board at a time.

We installed Trex Enhance composite decking in Toasted Sand, using hidden fasteners throughout the main field and color matched plugs where face fastening was necessary.

A picture frame border finished the perimeter. The center divider board gave the long surface a deliberate break and kept the layout visually balanced.

Trex Toasted Sand deck with a picture frame border and center divider board
The picture frame and divider board gave the long surface a deliberate rhythm.

The deck was nearly finished. The project was not.

New Railings and a Rebuilt Pergola

Once the decking and stairs were complete, the original landing railings gave way to a new Trex railing system in Charcoal Black. The darker frame created a clean contrast with the warm Toasted Sand surface.

Above the deck, we prepared the wall side support for the new pergola, then installed the rafters and upper members around the post covers the homeowner wanted to preserve for refinishing.

The deck had its finished surface. Now the structure that made it feel like an outdoor room was returning too.

Charcoal Black Trex railings installed around the Toasted Sand composite deck
The dark railing system framed the deck without closing it off from the yard.
Wood pergola rafters being installed above the new Trex deck
New rafters restored the feature that made the deck feel like an outdoor room.

The result · St. Matthews, Kentucky

The Same Backyard, Rebuilt From the Ground Up

What began as a surface update became a complete deck rebuild with new footings, 6x6 supports, a self supporting frame, new stairs, Trex Enhance decking, Charcoal Black railings and a rebuilt pergola.

Wide view of the finished Trex deck and rebuilt wood pergola in St. Matthews
The completed deck and pergola, rebuilt as one outdoor space.
Finished composite deck stairs leading to the concrete landing
New stairs create a more comfortable transition to the yard.
Finished landing connecting the back door to the main composite deck
The rebuilt landing reconnects the home with the main deck.

The homeowner kept the size, layout and outdoor space he already knew. What changed was everything supporting it, including the details that will rarely be seen again.

Finished wood pergola rafters and upper members above the deck
The rebuilt pergola restores the overhead structure the homeowner wanted to preserve.
Finished deck, stairs, fascia and railings viewed from the yard
From the yard, the entire rebuild reads as one complete structure.

This was not the project we expected when the first boards came off. It became the kind of project that defines how we work: show the homeowner what we find, explain the real options and build the approved solution with care from the ground up.

Does Your Deck Need More Than New Boards?

An aging surface does not always mean the entire deck must be rebuilt. It also does not guarantee the framing is ready for resurfacing.

Send us a few photos or schedule a deck visit. We will look at the surface, structure, stairs and railings, then explain whether repair, resurfacing or replacement is the practical next step.